Blogs

Notes on estimating, tendering and keeping a bid profitable — written by the people who price the work.

Latest articles

9 August 2026

Is my builder's quote fair? How to check before you sign

Three quotes, three very different totals. How to compare them properly, what a fair quote shows you, and the checks to make before you sign anything.

Read more

9 August 2026

Build cost per square metre: how to get to a real budget

Published rates cover building works only. What a cost per square metre leaves out, and how to get from floor area to a budget that holds up.

Read more

9 August 2026

How to price construction variations without losing money

Your tender rates decide what your variations are worth. How variations are valued, why conditions matter, and where contractors lose the money.

Read more

9 August 2026

What outsourced estimating costs, and when it pays for itself

What an outsourced estimator charges, how that compares with pricing jobs yourself, and the sum that tells you whether the fee pays for itself.

Read more

9 August 2026

How to read a bill of quantities

A bill of quantities lists every item of work with a measured quantity so every contractor prices the same scope. What the columns mean and where costs hide.

Read more

9 August 2026

Five costs contractors consistently underestimate

Preliminaries, programme overruns, waste, temporary works and non-productive labour. The five costs that turn a technically correct tender into a loss.

Read more

9 August 2026

When to bring in an external estimator

The trigger is not company size, it is the tenders you turn down for lack of time. How to tell when outsourcing estimating is a capacity call, not a cost one.

Read more

Get in Touch

Upload Here

Drag & Drop Here

Drag and drop to upload drawings, specifications, or documents with your enquiry.
- Upload limit of 30MB -