Industrial warehouse, Leeds

8 February 2026

Client
Developer
Sector
Industrial
Scope
Estimate, construction programme
Contract value
£6.5m
Turnaround
12 working days

TEMPLATE CONTENT — replace before publishing. Estimates and a construction programme for a steel-frame distribution unit, priced from drawings alone with a full schedule of assumptions.

The brief

A developer needed a cost and a programme early enough to test the scheme's viability, well before a contractor was appointed. What existed was a planning-stage drawing set and an outline specification.

The challenge

Pricing at this stage means pricing what is not yet drawn. The risk is producing a number that looks authoritative and is quietly built on assumptions nobody recorded.

  • Price the works that are drawn, at measured quantities
  • Price the works that are not, as clearly flagged allowances
  • Record every assumption in a schedule issued with the estimate
  • Produce a programme that matches the estimate's preliminaries

What we did

We measured the frame, envelope, slab and drainage from the drawings, and covered the remainder with allowances stated as allowances. The construction programme was built alongside the estimate so the preliminaries reflected the actual duration rather than a guess.

The outcome

The developer had a cost, a programme and a cashflow forecast they could take to funding, plus an explicit list of what would need revisiting once the design developed.

Outcome figures are placeholders. Replace with the real result, and only publish client details you have permission to use.

Get in Touch

Upload Here

Drag & Drop Here

Drag and drop to upload drawings, specifications, or documents with your enquiry.
- Upload limit of 30MB -